The Ring Main project covers manufacturing, testing at factory, packing, delivery, transport to site, complete erection, testing, commissioning, and handing over of new equipment as comprising :
- 12 kV, 31.5 kA metal clad switchgear.
- Power distribution transformers (Oil / Cast resin).
- Low voltage distribution boards.
- Telemetry Transfer Terminal Cabinet (TTTC)
- Interposing box for TTTC signals of LV board / MLTBs
- Batteries and charging equipment
- I I kV 300 sq. mm. 3-core CU/SC/XLPE/SC/SWA/PVC cables.
- 0.6/1 kV 800 sq. mm. single core, CU/XLPE/PVC cables.