The Concrete Substation project covers a turnkey job including civil building works, design and engineering, manufacturing of equipment related to Primary Substation, Installation, testing & Commissioning until the full operation of Substation.
Civil works comprise of the following:
The Civil building shall be single storey construction.
Building shall have a concrete skeleton structure and flat concrete roof.
Internal concrete roads, pathways, Guard room and boundary walls.
Separate indoor rooms for HV switchgear, MV switchgear, Batteries & Chargers, LV Distribution boards, Control & Relay boards, Telecommunication equipment, Neutral Resistors, Local Transformers and Fire-fighting equipment.
Outdoor concrete skeleton structure with raft foundation for Power Transformers and fire wall separation between the Transformers and sunshade.
Central Air-conditioning system and Heat ventilation system.
External and Internal lighting.
Fire-fighting water spray and Fire alarm system.
The Substation shall have the following major equipment’s:
400kV & 132kV HV Gas Insulated Switchgear
300MVA – 400/132kV and 30MVA – 132/11kV Power Transformers
45MVAR Shunt Reactors
Neutral Earthing arrangement (Gas Insulated for 400kV and MV Resistors for 11kV of Transformer Neutral)
11/0.433 kV Local Transformers for Substation auxiliary power.
33kV Gas Insulated switchgear with vacuum Breakers for Shunt Reactors.
11kV Metal clad switchgear with vacuum Breakers.
Remote control Panels for the operation of HV & MV Switchgears.
Protection Board for the above Switchgears.
LV AC & DC Distribution boards.
Batteries & Charging equipment.
Telemetry Equipment.
Intertrip equipment for feeders connected between Substations.
Fire alarm & water spray system Control panels.

132 kV Substation

Download Catalogue

The Concrete Substation project covers a turnkey job including civil building works, design and engineering, manufacturing of equipment related to Primary Substation, Installation, testing & Commissioning until the full operation of Substation.
Civil works comprise of the following:
The Civil building shall be single or double storey of construction.
Building shall have a concrete skeleton structure and flat concrete roof.
Internal concrete roads, pathways, Guard room and boundary walls.
Separate indoor rooms for HV switchgear, MV switchgear, Batteries & Chargers, LV Distribution boards, Control & Relay boards, Telecommunication equipment, Neutral Resistors, Local Transformers and Fire-fighting equipment.
Outdoor concrete skeleton structure with raft foundation for Power Transformers and fire wall separation between the Transformers and sunshade.
Central Air-conditioning and Heat ventilation system.
External and Internal lighting.
Fire-fighting water spray and Fire alarm system.
The Substation shall have the following major equipment’s:
132kV HV Gas Insulated Switchgear
30MVA,132/11.5kV Power Transformers
Neutral Earthing Resistors arrangement for 11kV side of Power Transformers
11/0.433 kV Local Transformers for Substation auxiliary power.
11kV Metal clad switchgear with vacuum Breakers.
Remote control Panels for the operation of HV & MV Switchgears.
Protection Board for the above Switchgears.
LV AC & DC Distribution boards.
Batteries & Charging equipment.
Telemetry Equipment.
Intertrip equipment for feeders connected between Substations.
Fire alarm & water spray system Control panels.

Ring Main Substation

Download Catalogue

The Ring Main project covers manufacturing, testing at factory, packing, delivery, transport to site, complete erection, testing, commissioning, and handing over of new equipment as comprising :
12 kV, 31.5 kA metal clad switchgear.
Power distribution transformers (Oil / Cast resin).
Low voltage distribution boards.
Telemetry Transfer Terminal Cabinet (TTTC)
Interposing box for TTTC signals of LV board / MLTBs
Batteries and charging equipment
I I kV 300 sq. mm. 3-core CU/SC/XLPE/SC/SWA/PVC cables.
0.6/1 kV 800 sq. mm. single core, CU/XLPE/PVC cables.

11 kV Elevated Substation

Download Catalogue

Elevated substations are typically built above the ground. Elevated substations often have enhanced safety features such as fencing, surveillance system and motorized gate to prevent unauthorized access and ensure secure operations. The 11kV Elevated main intake substation is normally fed from 132/11kV primary substation inside the same compound. In elevated substations, the raised floor is used for the installation of control and relay panels.
The Elevated Substation project covers a turnkey job including design and engineering, Civil works, manufacturing of equipment, Installation, testing & Commissioning until the full operation of Substation. Al -Ahleia switchgear Co. have executed many 11kV Elevated main intake substations for Kwait Oil & Gas Company.
Major Equipment’s in the 11kV Elevated main intake substations
11kV Double busbar switchgear.
Duplex control and relay panel
LV Switchgear
Transformers.
AC UPS System with batteries
DC UPS System with batteries.
Fire alarm and Gas detection System
Fire suppression System
HVAC System
Security Systems
Lan & Telecom system
E-SCADA System

Our Clients

Government Sector

diwan

Oil Sector Companies

chevron-1
kotc

Public Sector

Director General of Civil Aviation
Public Authority of Housing Walfare
Kuwait University

PMC

FLUOR
Worley Parsons
Technip

Export (public & Private)

QGEWC
itcc
ewa
voltageengr
gulfar
AALCO
qtech
degre_france
uneeco
mod_oman
omar
soc

EPC Contractors

hyundai
daelim
Mitsubishi_motors
hyndai eng
skengr
ncc
ABB
Technip
snamp
technicas
petrofac
areva
ganz
siemens
ansaldo
jgc
gs
hanwa