The Concrete Substation project covers a turnkey job including civil building works, design and engineering, manufacturing of equipment related to Primary Substation, Installation, testing & Commissioning until the full operation of Substation.

Civil works comprise of the following:

  • The Civil building shall be single or double storey of construction.
  • Building shall have a concrete skeleton structure and flat concrete roof.
  • Internal concrete roads, pathways, Guard room and boundary walls.
  • Separate indoor rooms for HV switchgear, MV switchgear, Batteries & Chargers, LV Distribution boards, Control & Relay boards, Telecommunication equipment, Neutral Resistors, Local Transformers and Fire-fighting equipment.
  • Outdoor concrete skeleton structure with raft foundation for Power Transformers and fire wall separation between the Transformers and sunshade.
  • Central Air-conditioning and Heat ventilation system.
  • External and Internal lighting.
  • Fire-fighting water spray and Fire alarm system.

The Substation shall have the following major equipment’s:

  • 132kV HV Gas Insulated Switchgear
  • 30MVA,132/11.5kV Power Transformers
  • Neutral Earthing Resistors arrangement for 11kV side of Power Transformers
  • 11/0.433 kV Local Transformers for Substation auxiliary power.
  • 11KV Metal clad switchgear with vacuum Breakers.
  • Remote control Panels for the operation of HV & MV Switchgears.
  • Protection Board for the above Switchgears.
  • LV AC & DC Distribution boards.
  • Batteries & Charging equipment.
  • Telemetry Equipment.
  • Intertrip equipment for feeders connected between Substations.
  • Fire alarm & water spray system Control panels.