CONCRETE SUBSTATIONS

Al-Ahleia executes turnkey-EPC projects for construction of 132 kV/11 kV Primary Substations for MEW, Kuwait. These substations incorporate equipment such as 30MVA Power Transformers, 250KVA Station Transformers, Neutral Grounding Resistors, 132kV Gas Insulated Switchgears, 11kV Double Busbar Vacuum Switchgear, associated Control & Relay Panels and Battery & Battery chargers. These substations also involve installation of 132kV Oil Filled / XLPE Cables and their accessories, 11kV XLPE Power Cables and other LV Power and Control Cables.

Electrical equipments are installed in single story / two story concrete building with basement and mezzanine floor. Concrete building is equipped with necessary Air Conditioning, Fire Fighting & Fire Alarm System, Small Power & Lighting Distribution Boards and substation Earthing System.

Al-Ahleia has complete range of test facilities for site testing and commissioning of these substations.